The Blackrod Connection Project is designed to provide both liquids and natural gas transportation infrastructure to support International Petroleum Corp.'s proposed Blackrod Steam Assisted Gravity Drainage facility. South Bow is proposing to develop and build a 25-km (16-mile), 12-inch crude oil pipeline and a 25-km (16-mile), 16-inch natural gas pipeline from the Blackrod Project to the existing Grand Rapids Pipeline System.
Stakeholder engagement completed
Q3 2023
Regulatory & Environmental applications submitted and approved by the AER
Q2 2024
Commence facility construction
Q3 2024
Commence pipeline construction
Q4 2024
Anticipated in-service date
2026
The Blackrod Connection Project is regulated by the Alberta Energy Regulator (AER).
If you have any questions about the Project, please reach out to us via the contact information below.
Our commitment to the safety of our people, pipelines and facilities is unwavering. Visit our Contact page for our complete list of emergency numbers.
South Bow welcomes enquiries from media. Please direct questions to:
1-855-669-8437
We welcome inquiries from analysts, shareholders and prospective shareholders at: